Review Meetings of Associated Transmission Systems (ATS)
Minutes of meeting taken by Member(PS), CEA on 26.08.2021 to review the progress of Associated Transmission System of Patratu STPP (3x800MW) |
|
|
Meeting notice to review the progress of ATS of Bajoli Holi, Singoli Bhatwari, Tapovan Vishnugad and Swara Kuddu HEPs | ||
Meeting notice to review the progress of Bhuj pooling station, associated 765kV/400kV transmission lines and dedicated lines (220kV) from wind power projects connecting with Bhuj pooling station to be chaired by CE(PSPM) on 28.09.2018 | ||
Review of progress of Mahan – Sipat 400 kV D/C transmission line being executed by Essar Mahan MP Limited taken by CE(PSPM) on 23.03.2018 | ||
Meeting to review construction progress of the Teesta-III – Kishanganj 400 KV D/C line to be held on 15.02.2017, chaired by Chief Engineer (PSPM),CEA | ||
Meeting to Review of progress of the ATS of Pare(110 MW), Kameng (600 MW) and Kishanganga(330 MW) HEPs held on 09.01.2017, chaired by Chief Engineer (PSPM),CEA | ||
Meeting notice to review progress of Transmission system associated with Essar Mahan TPS (2X600 MW) (400kV D/C Mahan-Sipat line) held on 04.12.2017 chaired by Member (PS), CEA | ||
Meeting to review the progress of transmmission system associated with hydro projects in Uttarakhand, Himachal Pradesh & Sikkim (i) To review construction progress of ATS of Hydroelectric Projects (Alaknanda, Lakhwar & Vyasi, Lata Tapovan, Phata Byung, Pipalkoti, Singoli Bhatwari, Tapovan Vishnugad, Tehri PSP) in Uttarakhand, (ii)To review construction progress of ATS of Hydroelectric projects (Bajoli Holi, Chango Yangthang, Chanju, Kashang-I,II & III, Shongtong Karcham,Swara kuddu, Tangnu Romai-I, Tidong-I,Uhl-III) in Himachal Pradesh, (iii)To review progress of Legship – New Melli 220kV D/C line associated with Tashinding HEP in Sikkim and (iv) Rescheduling of transmission system associated with Gadarwara STPP (2×800 MW) of NTPC held on 10.08.2017 chaired by Member (PS), CEA | ||
Meeting notice to review progress of Transmission system associated with Kishanganga HEP held on 12.06.2017 chaired by Chief Engineer (PSPM), CEA |