अन्य बैठकें
Minutes of the Meeting chaired by Member (Power Systems), CEA on 29.01.2025 through Hybrid mode to review the transmission schemes, “North Karanpura generation project of NTPC (ERSS XIX)”, “Evacuation of 4.5 GW RE injection at Khavda P.S. under Phase-II – Part A” and “System strengthening in northern region (NRSS XXXVI)” under the Chairmanship of Member (Power Systems), CEA – reg. | ||
Minutes of meeting taken by Chief Engineer(PSPM), CEA on 17.02.2025 regarding review of ISTS projects having SCOD/ Anticipated COD from Apr-2025 to Dec-2025 -Reg. | ||
Minutes of meeting taken by Chief Engineer(PSPM), CEA on 15.04.2025 on the issues raised by POWERGRID regarding solar park developers’ objections to the line corridor of 765 kV D/C Bhadla-III Bikaner-III Transmission line and line crossing issue raised by APRAAVA with POWERGRID-Reg. | ||
Minutes of meeting taken by Member(PS), CEA on 21.02.2025 regarding the issue of Land for 765 kV Ahmedabad – Navsari Transmission Line under Khavda Phase -II Part C transmission scheme and Gati Shakti Cargo Terminal -Reg. | ||
Minutes of meeting taken by Chief Engineer(PSPM), CEA on 24.04.2025 to review the Transmission Projects under GEC-I & GEC -II Schemes – regarding | ||
Minutes of meeting to review the progress of mapping of intra state transmission projects (transmission lines, transmission towers & Substations) on PM Gati Shakti National Master Plan (NMP) – reg. | ||
Minutes of the meeting held under the chairmanship of Member (Power Systems) on 4th December 2024 on the issues raised by RE developers w.r.t. Bikaner-III-Neemrana-II 765kV D/c Transmission lines-reg. | ||
Minutes of meeting to review the progress of transmission projects under GEC-I and GEC-II Scheme held under the chairmanship of Chief Engineer (PSPM), CEA through VC on 14-11-2024 -Reg. | ||
Meeting to review the progress of mapping of intra state transmission projects on PM GatiShakti Portal | ||
Meeting to review the progress of Associated Transmission System of Patratu STPP (3x800MW) -Reg. | ||
Meeting to review the progress of transmission projects impacting the Available Transfer Capacity (ATC)/ Total Transfer Capacity (TTC) requirement of Maharashtra | ||
Meeting to review the progress of intrastate transmission projects matching with construction of ISTS transmission system planned to meet the increasing ATC requirement of Gujarat, transmission projects under Green Energy Corridor- I and transmission projects targeted for FY 2024-25 | ||
Delay in downstream network for Goa-Tamnar and Nangbibra projects being implemented by M/s Sterlite. | ||
Meeting to review NERPSIP and Comprehensive Scheme in Arunachal Pradesh & Sikkim | ||
Meeting to review the “Transmission Network Adequacy for the State of Maharashtra” | ||
Meeting to review the “Transmission Network Adequacy for the State of Maharashtra” | ||
Meeting to review the “Transmission Network Adequacy for the State of Maharashtra” |
Minutes of the Meeting |
|
बैठक के मिनट्स 06.03.2017 को आयोजित दिल्ली एरिया-रेग के लिए पावर ट्रांसमिशन सिस्टम के तहत ट्रायंसमिशन लाइनों और सबस्टेशन की प्रगति की समीक्षा करने के लिए सदस्य (पीएस), सीईए की अध्यक्षता में आयोजित | ||
अरुणाचल प्रदेश और सिक्किम में ट्रांसमिशन और वितरण प्रणाली के सुदृढ़ीकरण के लिए व्यापक योजना के तहत ट्रांसमिसन कार्यों की प्रगति की समीक्षा के लिए बैठक के मिनट्स (ii) पूर्वोत्तर क्षेत्र विद्युत प्रणाली सुधार परियोजना 24-04.2017 को जम्मू-कश्मीर (जेएंडके) में अलुस्टेंग (श्रीनगर) से लेह तक 220केवी ट्रांसमिशन प्रणाली के सुदृढ़ीकरण के लिए छह एनईआर राज्यों के लिए पूर्वोत्तर क्षेत्र विद्युत प्रणाली सुधार परियोजना (एनईआरपीआईपी) का आयोजन किया गया। | ||
ट्रांसमिशन लाइन क्रॉसिंग के लिए रेलवे क्लीयरेंस पर वेब पोर्टल के विकास के लिए बैठक के मिनट्स। मुख्य अभियंता (पीएसपीएम) सीईए की अध्यक्षता में 05.06.2017 को आयोजित | ||
मुख्य अभियंता (पीएसपीएम), सीईए की अध्यक्षता में 30.06.2017 को आयोजित ट्रांसमिशन लाइनों के निर्माण के लिए रेलवे मंजूरी के लिए रेलवे मंत्रालय द्वारा वेब पोर्टल विकास के लिए बैठक के मिनट्स |