Screen Reader Access स्क्रीन रीडर का उपयोग

Government of India भारत सरकार

Ministry of Power विद्युत मंत्रालय

Central Electricity Authority केंद्रीय विद्युत प्राधिकरण

What's New

Sl. No. Title Date Download/View Details
1 Seeking Public Comments on draft List of Relevant Standards applicable under CEA( Measures relating to Safety and Electric Supply) Regulation 2023 and Amendments thereof 05-10-2026
2 Engagement of retired Officers as Consultants in CEA – Reg. 01-10-2026
3 The last date for submission of public comments on Draft Central Electricity Authority (Technical Standards for Construction of Electric Plants and Electric Lines) 2nd Amendment, Regulations, 2026 has been extended from 04.10.2026 to 15.10.2026. 30-09-2026
4 Notice & Agenda for 18th NPC Meeting to be held on 18.09.2026 at Rajgir, Bihar 10-09-2026
5 Draft Central Electricity Authority (Technical Standards for Construction of Electric Plants and Electric Lines) 2nd Amendment, Regulations, 2026- Invitation of Public Comments till 04.10.2026 03-09-2026
6 Report On Ramp Rate compliance framework And Scheduling Methodology for the coal-based power plant 31-08-2026
7 “Report of the Committee to examine Wear & Tear, O&M and Plant Lifespan Implications due to flexible operation and analysis of 2-shift Operational Data” 31-08-2026
8 Report of Committee for trajectory of Indeginsation of SCADA system 25-08-2026
9 Cyber Security Regulations 12-08-2026
10 “Notice of Result–Appointment to the post of Multi-Tasking Staff of General Central Service on compassionate grounds” 10-08-2026
11 Draft Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2026- Invitation of Public Comments. 04-08-2026
12 CEA advisory to Transmission Utilities for adoption of New Technology options in forest area as prescribed in the Schedule VII of the CEA (Technical Standards for Construction of Electrical Plants and Electric Lines) Amendment Regulations, 2025 to reduce RoW (30.07.2026) 30-07-2026
13 Compendium of Definitions contained in the Electricity Act, 2003, Rules notified by the Ministry of Power, CEA Regulations and CERC Regulations 30-07-2026
14 Compendium of Definitions contained in the Electricity Act, 2003, Rules notified by the Ministry of Power, CEA Regulations and CERC Regulations 25-08-2026
15 Guidelines on advanced methodologies for adoption during investigation, tender and construction stages of hydel projects for minimizing geological uncertainties in long water conductor systems 31-08-2026
16 Report of the National Workshop on RE integration through ESS Phase-II 31-08-2026
17 “Notice for Filling up One (01) Vacancy of Despatch Rider on a Deputation Basis in CEA.” 31-08-2026
18 “Notice for Filling up One (01) Vacancy Each of Stenographer Grade-I and Private Secretary on a Deputation Basis in the Subordinate Offices of CEA.” 31-08-2026
19 Inviting comments/suggestions from stakeholders on the draft “Compendium of Definitions 31-08-2026
20 General Implementation timelines for Inter-State Transmission System (ISTS) projects 31-08-2026
21 Monthly Installed Capacity Report as on 31.05.2026 31-08-2026
22 Extension of last date for submitting comments on Amendment-II to the Manual on Transmission Planning Criteria, 2023. 31-08-2026
23 Advisory on use of Ester Oil as a Technological Option in Transformers 31-08-2026
24 Notice inviting suggestions comments on Amendment-II to the Central Electricity Authority (Manual on Transmission Planning Criteria), 2023. 31-08-2026
25 Standard Technical Specifications For Single-Phase And Three-Phase CRGO Core Distribution Transformers (Part-I) 31-08-2026
26 Report on Workshop on the “SHANTI Act, 2025: Enabling India’s 100 GW Nuclear Power Roadmap through Public–Private Partnership” 31-08-2026
27 Need for national framework for Rationalizing Fixed Charges and Tariff Redesign 31-08-2026
28 Monthly Installed Capacity Report as on 30.04.2026 31-08-2026
29 Report of the Committee on addressing Insulator Failure on Transmission Line (May, 2026) 31-08-2026
30 “Inviting comments on draft recruitment rules for the post of Library & Information Assistant, CEA” 31-08-2026
31 Workshop of Shanti Act 2025: Enabling India’s 100 GW Nuclear Power Roadmap 31-08-2026
32 National Workshop on RE integration through ESS Phase-II to be held on 30.04.2026 in hybrid mode 31-08-2026
33 Monthly Installed Capacity Report as on 31.03.2026 31-08-2026
34 Notice of Result–2024 for appointment to one post of Canteen Attendant in the Departmental Canteen, CEA 31-08-2026
35 Notice of Result–2023 for appointment to one post of Canteen Attendant in the Departmental Canteen, CEA 31-08-2026
36 Report of the Committee on the Use of Green GIS Technology in the Indian Grid 31-08-2026
37 ENGAGEMENT OF GRADUATE/DIPLOMA APPRENTICES TRAINEES (ENGINEERING) AS PER THE APPRENTICES ACT, 1961 31-08-2026
38 Long Term National Resource Adequacy Plan (2026-27 to 2035-36) 31-08-2026
39 “Ash Generation and Utilization at Coal/Liginite-Based Grid-Connected Thermal Power Stations for the Year 2024-25” 31-08-2026
40 Transmission Plan for Integration of over 900 GW Non-Fossil Fuel Capacity by 2035-36 31-08-2026
41 National Generation Adequacy Plan( 2026-27 to 2035-36) 31-08-2026
42 Clarification on Acceptance of In-House Type Testing of any Electrical Equipment/Material in NABL-Accredited Laboratories as per clause 3(d) of CEA’s Type Test Guidelines 31-08-2026
43 Monthly Installed Capacity Report as on 28.02.2026 31-08-2026
44 Invitation of public comment on Draft Central Electricity Authority (Installation and Operation of Meters) Amendment Regulations, 2026, last date of submission – 26.03.2026 31-08-2026
45 Draft Report of the Committee on Wear & Tear, O&M and Plant Lifespan Implications due to flexible operation 31-08-2026
46 Monthly Installed Capacity Report as on 31.01.2026 31-08-2026
47 Manufacturing Capacity of Grid Forming Inverters in India 31-08-2026
48 Notice Inviting Applications for the Post of Despatch Rider on Deputation Basis from Regular MTS of CEA 31-08-2026
49 Compliance of CEA “Standard Specifications and Technical Parameters for Transformers and Reactors (66 kV & above voltage class)” 31-08-2026
50 Report on Roadmap to 100 GW of Hydro Pumped Storage Projects 31-08-2026
51 Monthly Installed Capacity Report as on 31.12.2025 31-08-2026
52 Guidelines for Model Quality Assurance Plan (MQAP) for Major Equipment of Power Sector 31-08-2026
53 Guidelines for the Type Tests for Major Equipment of Power Sector 31-08-2026
54 Issuance of revised “Guidelines for the Type Tests for Major Equipment of Power Sector” and “Guidelines for Model Quality Assurance Plan (MQAP) for Major Equipment of Power Sector” 31-08-2026
55 Invitation of comments on draft Technology Catalogue by 15.02.2026 31-08-2026
56 All India Electricity Statistics – General Review 2025 31-08-2026
57 GROWTH OF ELECTRICITY SECTOR IN INDIA FROM 1947- 2025 31-08-2026
58 Monthly Installed Capacity Report as on 30.11.2025 31-08-2026
59 Concept note on revenue certainty & Tax incidence during Monetization of Transmission Asset 31-08-2026
60 Request for Proposals for Research and Development in the Power Sector – reg. 31-08-2026
61 Submission of information regarding identified critical items those are currently being imported and support required for their localisation- reg. 31-08-2026
62 “Inviting Public Comments on draft Standard Operating Procedure (SOP) for Independent Third-Party Fire Safety Audit of Battery Energy Storage System (BESS)” 31-08-2026
63 Notice of result for appointment to one post of canteen attendant and one post of canteen clerk in the Departmental Canteen, CEA 31-08-2026
64 Minutes of Meeting held under chairmanship of CE (ET&I) on Distribution Tranformers dated 29-10-2025. 31-08-2026
65 Draft Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Waste to Energy Projects prepared 31-08-2026
66 Concept note on revenue certainty & Tax incidence during Monetization of Transmission Asset 31-08-2026
67 Corrigendum w.r.t. Technical parameters of 400/132 kV, 315 MVA, 3-Phase Auto Transformer specified in CEA’s “Standard Specifications and Technical Parameters for Transformers and Reactors (66 kV and above)” 31-08-2026
68 Minutes of the meeting of Standing Committee of Experts on failure of EHV transmission towers failed during the period from January 2025 to June 2025 31-08-2026
69 Master Plan for Evacuation of Power from Hydroelectric Plants in the Brahmaputra Basin 31-08-2026
70 Details report of webinar held on Advanced Solar cell technology along with enclosed PPT. 31-08-2026
71 Minutes of the meeting of the Standing Committee of the Experts to discuss the failure of 220 kV and above voltage level Transformers during period of January, 2025 to June, 2025 31-08-2026
72 Draft Central Electricity Authority (Technical Standards for Construction of Electrical Plants and Electric Lines) (2nd Amendment) Regulations, 2025-Invitation of Public Comments. 01-09-2026
73 Draft Central Electricity Authority (Cyber Security in Power Sector) Regulations, 2025- Invitation of Public Comments. 01-09-2026
74 Issue and measures taken to improve the quality of power sector equipment and installation -reg 01-09-2026
75 Identification of Unit(s) of a generating station for captive purpose owned by SPV (As per rule 3(1)(b) of Electricity Rule 2005 and para 6.8(i) of captive procedure) 01-09-2026
76 Draft Revised “Guidelines for Model Quality Assurance Plan (MQAP) for major equipment of Power Sector” 01-09-2026
77 Draft Revised “Guidelines for the Type Tests for major equipment of Power sector” 01-09-2026
78 Inviting Comment on Draft Revised “Guidelines for the Type Tests for Major Equipment of Power Sector”, and Draft Revised “Guidelines for Model Quality Assurance Plan (MQAP) for Major Equipment of Power Sector” 01-09-2026
79 Extension of last date for submission of public comments on draft Central Electricity Authority (Measures relating to Safety and Electric Supply) (1st Amendment) Regulations, 2025 till 27.07.2025 01-09-2026
80 Filling up of 01 VACANCY of CANTEEN ATTENDANT ‘ and 01 VACANCY of Canteen CLERK by Direct Recruitment basis in the Departmental Canteen of CEA. 01-09-2026
81 CEA Guidelines for Automatic Weather Stations for Solar and Wind Power Plants 01-09-2026
82 Safety Booklet-CEA, 2025 01-09-2026
83 Draft Central Electricity Authority (Measures relating to Safety and Electric Supply) (1st Amendment) Regulations, 2025 01-09-2026
84 Report of the Standing Committee of Experts on failure of EHV Transmission Line Towers failed during the Period from January, 2024 to December, 2024 01-09-2026
85 Invitation for CommentsSuggestions on identified Critical Imported Items and Support required for their Indigenous Development of such critical items– Reg..pdf 01-09-2026
86 Report of the National Workshop on RE integration through ESS (Phase-I) held on 08.05.2025 01-09-2026
87 ADVICE ON FGD TECHNOLOGY SELECTION FOR DIFFERENT UNITS SIZE (FROM 01st NOVEMBER 2024 ONWARDS) 01-09-2026
88 IIT Delhi Report, 2024: Study to survey ambient atmospheric SO2 concentrations in different category of cities based on their vicinity to thermal power plants (TPPs). 01-09-2026
89 Report of Standing Committee of Experts on Failure of 220 kV and above Voltage Class Substation Equipment failed between July 2023 to December 2024 01-09-2026
90 Draft Central Electricity Authority (Technical Standards for Construction of Electrical Plants and Electric Lines) (1st Amendment) Regulations, 2025 01-09-2026
91 Clarification regarding co-locating Energy Storage systems with Solar Power Projects 01-09-2026
92 Issuance of “Guidelines on Unified Philosophy for Placement of Phasor Measurement Unit (PMU) in Indian Grid” 01-09-2026
93 Rescheduling of 1st Meeting of 21st Electric Power Survey 01-09-2026
94 Draft Central Electricity Authority (Installation and Operation of Meters) (5th Amendment) Regulations, 2025 01-09-2026
95 CEA Issues “Comprehensive guidelines for the usage and sharing of fiber cores of Optical Ground Wire (OPGW)/ Under Ground Fiber Optic (UGFO) Cable for power system applications.” 01-09-2026
96 Advisory on co-locating Energy Storage systems with Solar Power Projects to enhance grid stability and cost efficiency 01-09-2026
97 Advice on FGD technology selection for different units size 01-09-2026
98 Methodology for Capacity Credit of Generation Resources & Coincident Peak Requirement of Utilities Under Resource Adequacy Framework 01-09-2026
99 Procedure for verification of captive status of such generating plant, where Captive Generating Plant and its Captive User(s) are located in more than one state 01-09-2026
100 Guidelines for Benchmarking of Operation & Maintenance (O&M) Norms for Distribution Utilities 01-09-2026
101 Guidelines for Standardization and Interoperability in AMI Systems for End to End Communication between Smart Meter, HES and MDM 01-09-2026
102 Manual on Transmission Planning Criteria (With Amendment-I) 2025 01-09-2026
103 Background Note on alternative mechanism for implementation of Fuel and Power Purchase Adjustment Surcharge (FFPAS) under Rule14 (Timely recovery of power purchase cost by distribution licensee) of the Electricity (Amendment) Rules, 2022 01-09-2026
104 Outcome Document- Workshop on Monetization of Transmission Assets organised by Central Electricity Authority in collaboration with PFCCL, PGInvIT and NIIF on 06.12.2024 in New Delhi 01-09-2026
105 Minutes of 15th NPC meeting held on 14.11.2024 at Nagpur, Maharashtra 01-09-2026
106 Facilitating Broadband Expansion by Allowing Leasing of Fibres on OPGW 01-09-2026
107 Comments of CEA on CERC draft order dated 04.10.2024 regarding directions to power exchanges 01-09-2026
108 Notice & Agenda for 15th NPC Meeting to be held on 14.11.2024 at Nagpur Maharashtra 01-09-2026
109 Extension of deadline for submission of comments/suggestions on draft Discussion Paper titled “Methodology for Capacity Credit of Generation Resources & Coincident Peak Requirement of Utilities under the Resource Adequacy Framework” 01-09-2026
110 Draft Discussion Paper on Methodology for Capacity Credit of Generation Resources & Coincident Peak Requirement of Utilities under Resource Adequacy Framework 01-09-2026
111 Draft Central Electricity Authority (Procedure for Transaction of Business) (Amendment) Regulations, 2024. 01-09-2026
112 Notice for the 15th meeting of National Power Committee (NPC). 01-09-2026
113 Report of the Committee for calculation of reduction of Right-of-Way (RoW) width through technological options 01-09-2026
114 Draft calculation sheet for the report of the Committee for calculation of reduction of Right-Of-Way (ROW) width through technological options 01-09-2026
115 Regarding Government Employee Appliance Scheme on Energy Efficiency (GovEasEE) for promotion energy efficiency amongh employees of Central Government, Sate Government and Public Sector Enterprises. 01-09-2026
116 Report on Status of Metering in the Country as on 31st March, 2024 01-09-2026
117 Advisory for proactive and comprehensive monitoring of Transmission Lines to Ensure Safety 01-09-2026
118 Advisory for compliance of latest Relevant Standard 01-09-2026
119 Sanction of the competent authority is hereby conveyed to the engagement of the following retired officers as Consultant in CEA with effect form 02.09.2024 for a preiod of 6 Month. 01-09-2026
120 wd: Strict compliance of the provisions of Flag Code of India, 2002 [as amended in 2021 & 2022] and the Prevention of Insults to National Honour Act, 1971 -reg. 01-09-2026
121 Draft Central Electricity Authority (Cyber Security in Power Sector) Regulations, 2024—Invitation for Public Comments 01-09-2026
122 Presentation on India as Single bidding zone 01-09-2026
123 India as a Single Bidding Zone 01-09-2026
124 Amendment in the Guidelines for Import/ Export (Cross Border) of Electricity, 2018 01-09-2026
125 Amendment-II to the Procedure for approval and facilitating Import/Export (Cross Border of Electricity) by the Designated Authority 01-09-2026
126 Minutes of the Meeting on 01.07.2024 (Monday) at 03:30 PM to discuss the matter referred by CERC in the Petition No. 132/MP/2024 – RIL vs. CTUIL and Ors. 01-09-2026
127 Minutes of the meeting taken by Chairperson, CEA on 26.07.2024 (Friday) at 11:00 AM to discuss the pending applications Wind Power Plants for CON-4 and FTC approval. 01-09-2026
128 Agenda for 21st Meeting of NCT 01-09-2026
129 Filling up of 01 Vacancy of Canteen Attendant (in PB-1, Grade Pay- 1800, Level-1) by Direct Recruitment basis in the Departmental Canteen of CEA. 01-09-2026
130 Notice inviting suggestions / comments on Amendment-I to the CEA (Manual on Transmission Planning Criteria), 2023 01-09-2026
131 Minutes of the 20th Meeting of National Committee on Transmission (NCT) 01-09-2026
132 Revised SOP for Early Warning System in Hydro Electric Projects 01-09-2026
133 Advisory for implementation of the BIS Standards and Quality Control Orders related to copper products and its alloys 01-09-2026
134 Testing of carbon fibre composite (CFC) core of HTLS conductors. 01-09-2026
135 Revised Guidelines for retirement & up-rating / de-rating of Generating Unit(s) 01-09-2026
136 Report on Finalisation of Opening and Closing time ranges of guide vane during turbine and pumping modes of operation in Pumped Storage Plants 01-09-2026
137 List of Net Meter Manufacturers 01-09-2026
138 Lineman Diwas Report -2024 01-09-2026
139 Clarification regarding GIS and Hybrid Switchgear type test validity for the Distribution sector 01-09-2026
140 Procedure for assessment of the Design Temperature for RE Plants in compliance to CEA (Technical Standards for Connectivity to the Grid) Regulations 01-09-2026
141 Sachet Magazine (Bilingual) 01-09-2026
142 Extension of deadline for submission of comments on Draft National Electricity Plan (Volume-II: Transmission) till15th April, 2024 01-09-2026
143 Advisory for implementation of the BIS Standards and Quality Control Orders related to aluminium ingots, wire rods and wires used for the manufacture of conductors / cables 01-09-2026
144 Minutes of the 18th Meeting of National Committee on Transmission (NCT) 01-09-2026
145 Agenda for the 18th Meeting of National Committee on Transmission (NCT) 01-09-2026
146 Minutes of the 14th Meeting of NPC held on 03.02.2024 at Bangalore 01-09-2026
147 Minutes of the 17th Meeting of National Committee on Transmission (NCT) –regarding 01-09-2026
148 Techno-Economic Analysis of Renewable Energy-Round the Clock (RE-RTC) Supply for Achieving India’s 500 GW Non-Fossil Fuel Based Capacity Target by 2030 01-09-2026
149 Seeking Comments on Draft guidelines for retirement & up-rating / de-rating of generating units-reg. 01-09-2026
150 Office Memorandum for Fees Schedule for Recognition of Training Institute, February 2024. 01-09-2026
151 Additional agenda for 14th NPC meeting to be held on 03.02.2024 at Bangalore 01-09-2026
152 Draft National Electricity Plan (Volume-II: Transmission) – Inviting inputs/comments/suggestions by 26th March 2024 01-09-2026
153 Draft Central Electricity Authority (Installation and Operation of Meters) Amendment Regulations, 2024—5th Amendment—Invitation of Public Comments—Last Date: 26.02.2024 01-09-2026
154 Report on Increasing the PLF of Pithead Coal Based Power Plants 01-09-2026
155 Tech Specifications- Net Meter for Solar Application- Static & Smart Meters (1Ph-3 Ph) 01-09-2026
156 Electricity Distribution Network Planning Criteria – CEA 01-09-2026
157 Agenda of the 17th meeting of National Committee on Transmission (NCT) 01-09-2026
158 Agenda of the 14th NPC meeting to be held on 03.02.2024 at Bangalore. 01-09-2026
159 Report on One Day Workshop for RE Developers of Rajasthan on 22.12.2023 at Jaipur, Rajasthan organized by CEA. 01-09-2026
160 Guidelines for Recognition of Training Institutes in the field of Distribution of Electricity including details of Training Curriculum for Engineers, Supervisors and Technicians January, 2024 01-09-2026
161 Guidelines for Recognition of Training Institutes in the field of Generation of Electricity including details of Training Curriculum for Engineers, Supervisors and Technicians January, 2024 01-09-2026
162 Guidelines for Recognition of Training Institutes in the field of Transmission of Electricity including details of training Curriculum for Engineers, Supervisors and Technicians January, 2024 01-09-2026
163 Statutory Guidelines for Training and Certification of Load Despatchers & Recognition of Training Institutes January, 2024 01-09-2026
164 Report on One Day Workshop for RE Developers of Rajasthan on 22.12.2023 at Jaipur, Rajasthan organized by CEA. 01-09-2026
165 Minutes of the 16th meeting of NCT 01-09-2026
166 Draft Procedure for Verification of the Captive Status of Generating Plants—Inviting Public Comments—Last Date of Submission extended up to 08.12.2023 01-09-2026
167 Compensation methodology for operating a Thermal (Coal) Generating unit below 55% Minimum Power Level 01-09-2026
168 Agenda for the 16th Meeting of National Committee on Transmission (NCT) –regarding. 01-09-2026
169 Advisory to ensure One Nation, One License for Electrical Contractors 01-09-2026
170 Report of the Committee to make recommendation on the issue of scheduling of DVC Generators 01-09-2026
171 Report on Reverse Charging of Grid from Batteries of Electric Vehicles 01-09-2026
172 Draft Procedure for Verification of the Captive Status of Generating Plants—Inviting Public Comments—Last Date of Submission—01.12.2023 01-09-2026
173 Minutes of the Meeting held on 13.10.2023 to discuss non-compliances of CEA (Technical Standards for connectivity to the Grid) Regulations by RE developers by 30.09.2023 01-09-2026
174 Note on the Clarification of GIS and Hybrid GIS –Distribution Switchgear (33 kV, 22 kV & 11kV) 01-09-2026
175 Minutes of Meeting held on 23.08.2023, 06.09.2023 and 25.09.2023 to discuss compliance of CEA (Technical Standards for Connectivity to the Grid) Regulations 01-09-2026
176 Minutes of Meeting held on 29.08.2023 to discuss operational issues w.r.t. new STATCOMs at ISTS in RE complexes 01-09-2026
177 Minutes of the Meeting held on 13.09.2023 to discuss issues related to pending CON-4/ First Time Charging (FTC) applications of RE developers 01-09-2026
178 Guidelines for Slope Stability in Hydro Power Projects 01-09-2026
179 National Seminar under Mission LiFE on“ 6 Point Understanding of Climate Change & Corrective Actions” on 10th October 2023 at 5.30 P.M – 7.00 P.M (Online) by NPTI 01-09-2026
180 Constitution of Standing Technical Committee to study the issues in the event of any geological surprise faced in the Hydroelectric Projects 02-09-2026
181 Anticipated Energy Requirement and Peak Demand for FY 2024-25 02-09-2026
182 Minutes of the 15th Meeting of National Committee on Transmission (NCT) –regarding 02-09-2026
183 Revised Guidelines for Qualifying Requirements for Bidders of Balance of Plant for Coal/Lignite based Thermal Power Stations 02-09-2026
184 Submission of Safety Audit Reports as per Central Electricity Authority (Safety Requirements for Construction, Operation and Maintenance of Electrical Plants and Electric Lines) (Amendment) Regulations, 2022- reg. 02-09-2026
185 Agenda for the 15th meeting of National Committee on Transmission 02-09-2026
186 Growth of Electricity Sector in India (1947-2023) 02-09-2026
187 Minutes of the 13th Meeting of NPC held on 05.07.2023 at Kolkata 02-09-2026
188 Amendment-1 to the Procedure for approval and facilitating Import/Export (Cross Border) of Electricity) by the Designated Authority 02-09-2026
189 CEA Committee Report on Requirement of Variable Speed machine vis-a-vis Fixed Speed machine in PSPs 02-09-2026
190 Guidelines for Medium and Long Term Power Demand Forecast 02-09-2026
191 All India Electricity Statistics – General Review-2023 02-09-2026
192 Revision in methodology for calculation of AT&C losses 02-09-2026
193 Minutes of the 14th meeting of National Committee on Transmission (NCT) 02-09-2026
194 GUIDELINES ON DESIGN, CONSTRUCTION, O&M and ANNUAL CERTIFICATION of COAL ASH PONDS 02-09-2026
195 Notice-Reschedule of 13th National Power Committee(NPC) Meeting to 5th July 2023 02-09-2026
196 Notice inviting suggestions / comments on Draft Paper on reconductoring of Transmission Lines in ISTS 02-09-2026
197 Operation and Maintenance (O&M) guidelines and Standard Format for Memorandum of Understating between New TSP and Existing TSP 02-09-2026
198 Notice/Agenda for the13th meeting of National Power Committee(NPC)-Scheduled to be held on 07.07.2023. 02-09-2026
199 Guidelines for Field Efficiency Test in Hydropower Plants (including Pumped Storage Projects) 02-09-2026
200 Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023 02-09-2026
201 Agenda for the 14th meeting of National Committee on Transmission (NCT) 02-09-2026
202 Minutes of the meeting held on 18.05.2203 regarding compliance of of CEA ( Technical Standards for Connectivity to Grid) regulations 02-09-2026
203 Compliance of CEA ( Technical Standards for Connectivity to Grid) regulations by RE developers letter dtd 12.05.2023 02-09-2026
204 National Electricity Plan-Vol-I: Generation(Notified vide Extra ordinary Gazette No. 3189, SI. No. 329,under part-III, Section IV dated 18.05.2023) 02-09-2026
205 Approved Revised Guidelines for Model Quality Assurance Plan (MQAP) for Major Equipment used in Power Distribution Sector 02-09-2026
206 Minutes of the 13th meeting of National Committee on Transmission (NCT) 02-09-2026
207 Agenda for the 13th Meeting of National Committee on Transmission (NCT) 02-09-2026
208 MoU between CEA and TERI 02-09-2026
209 Inviting Public Comments on Draft Modification-Model Quality Assurance Plan (MQAP) for Major Equipment in Thermal Power Plant 02-09-2026
210 Report on Optimal Generation Capacity Mix for the year 2029-30 (Version 2.0) 02-09-2026
211 Nationwide Monthly Webinar Series – Anubhav Awardees Speak 02-09-2026
212 Holding of Nation – wide Pension Adalat, on 17th May, 2023, Nominatoin of Officers – Regarding 02-09-2026
213 Minutes of the 12th meeting of NCT 02-09-2026
214 Inviting Public Comments – Guidelines for Medium and Long Term Power Demand Forecast 02-09-2026
215 POWER GLOSSARY 02-09-2026
216 SOP & Training Curriculum at 55% MTL 02-09-2026
217 Agenda for the 12th Meeting of National Committee on Transmission (NCT) –regarding 02-09-2026
218 MoU between CEA and IIT Delhi, March 2023 02-09-2026
219 Procedure for Shifting of Transmission Lines involving in work by other Infrastructure Developers 02-09-2026
220 Guidelines and Best Practices for O&M of Distribution Transformers 02-09-2026
221 Manual on Transmission Planning Criteria, 2023 02-09-2026
222 Hon’ble Minister of Power launches a Report on Flexibilisation of Coal Fired Power Plant: A Roadmap for Achieving 40% Technical Minimum Load 02-09-2026
223 Inviting Public Comments – Revised Guidelines for Model Quality Assurance Plan (MQAP) for Distribution Sector 02-09-2026
224 Growth of Electricity Sector in India (1947-2022) 02-09-2026
225 All India Electricity Statistics – General Review-2022 02-09-2026
226 Draft Central Electricity Authority (Construction of Electric Lines in Great Indian Bustard Area) Regulations, 2023 for inviting public/stakeholders comments (Last date 3rd March, 2023) 02-09-2026
227 Central Electricity Authority (Flexible Operation of Coal based Thermal Power Generating Units) Regulations, 2023 02-09-2026
228 Disaster Management Plan (DMP) 2022 for Power Sector 02-09-2026
229 Statistics/Data for Micro Grids and Mini Grids 02-09-2026
230 CDM – CO2 Baseline Database (Version 18.0) 02-09-2026
231 Central Electricity Authority (Technical Standards for Construction of Electrical Plants and Electric Lines) Regulations, 2022 02-09-2026
232 Minutes of Meeting held to discuss the issue of provisions regarding the Nitrogen Injection System for Transformers /Reactors as covered in the CBIP Manual on Transformers. 02-09-2026
233 Agenda for 11th meeting of NCT 02-09-2026
234 Transmission Plan for Integration of over 500 GW Non-fossil capacity by 2030 02-09-2026
235 Minutes of the 10th meeting of National Committee on Transmission (NCT) 02-09-2026
236 Extension of deadlines for submission of comments on Draft National Electricity Plan(Vol I Generation) till 15th December 2022. 02-09-2026
237 Extension of deadlines for submission of comments on Draft National Electricity Plan(Vol I Generation) till 15th December 2022 02-09-2026
238 Draft National Electricity Plan (Vol I Generation)-inviting comments by 5th December 2022 02-09-2026
239 Report on 20th Electric Power Survey (EPS) of India (Volume-I) 02-09-2026
240 Central Electricity Authority (Safety Requirements for Construction, Operation and Maintenance of Electrical Plants and Electric Lines) (Amendment) Regulations, 2022 02-09-2026
241 Minutes of the 12th NPC meeting held on 17th October 2022 02-09-2026
242 Strengthening the Central Secretariat Cadre management System (CSCMS) portal by up-dating the data of employees of CSS,CSSS and CSCS Cadres and to enable online Cadre Management &delivery of services to these cadres-reg 02-09-2026
243 Continuation of existing applications hosted on local IP 10.23.171.47 – reg. 02-09-2026
244 Awareness Lecture on “Sexual Harassment of Women at Workplace and related procedures in CEA 02-09-2026
245 Ease of Doing Business (EoDB) Reducing Regulatory Compliance Burden 02-09-2026
246 Activities to be conducted in CEA during Vigilance Awareness Week, 2022 (from 31.10.2022 to 06.11.2022). 02-09-2026
247 Login to newly developed intranet portal – reg. 02-09-2026
248 Regulatory Affairs Division As Coordination division for all Regulations 02-09-2026
249 Vacancy Circular – Filling up the post of Chief Estate Manager & Meeting Office in Level 11 in UPSC 02-09-2026
250 List of stations not sent monthly environment data for month of august-2022 02-09-2026
251 Meeting Notice/Agenda for 12th National Power Committee-Scheduled to be held on 14.10.2022. 02-09-2026
252 Draft Resource Adequacy Guidelines-inviting stakeholders’ comments by 15th October,2022 02-09-2026
253 Agenda for the 9th Meeting of National Committee on Transmission (NCT) – regarding 02-09-2026
254 Amendment in CEA (Cyber Security in Power Sector) Guidelines, 2021-reg 02-09-2026
255 Special Campaign 2.0 for disposal of Pending Matters from 02, October, 2022 to 31 October, 2022 – regarding 02-09-2026
256 Draft National Electricity Plan (Vol I Generation)-inviting comments by 5th December 2022 02-09-2026
257 VACANCY CIRCULAR (Filling up of the post of Director General ) CPRI 02-09-2026
258 Weeding out of old records – during campaign period ( 16th August, 2022 to 15th November, 2022) as per precursor to Vigilance Awareness Week 2022. 02-09-2026
259 Updation of Manual on Procurement of Goods, Services, Works and Consultancy, etc. – Regarding. 02-09-2026
260 IIT Delhi Study Report on FGD Implementation 02-09-2026
261 Minutes of Special Meeting of NPC held on 24.06.2022. 02-09-2026
262 Cancellation of OM dated 14.07.2022 regarding purchase proposals of Sub-Offices of CEA 02-09-2026
263 cancellation of OM dtd 14.07.2022 regarding purchase proposals of Sub-Offices of CEA 02-09-2026
264 Committee formation for assessment of flexible power and ramp rate to be required in the year 2030 for integration of 500 GW RES – reg. 02-09-2026
265 Submission of Purchase proposal by Sub-Offices-Reg. 02-09-2026
266 Technical Specification of IEM, AMR and MDP system for ISTS 02-09-2026
267 Draft Central Electricity Authority (Flexible operation of thermal power plants) Regulations, 2022 02-09-2026
268 Standard Technical Specification For Steel Monopole Structure For AC Transmission Line 02-09-2026
269 Compliance of the provisions of Rule 4 of the Central Civil Services (Conduct) Rules, 1964 relating to employment of near relatives of Government servant in private companies or firms 02-09-2026
270 Submission of application on NSWS portal seeking authorization under section 164 of Electricity Act, 2003 02-09-2026
271 Revised Categorization of Thermal Power Units by Taskforce (CPCB) 02-09-2026
272 Suggestions for Logo of CSIRT-Power 02-09-2026
273 Technical Specifications for Bird Flight Diverter(BFD) issued by SC Committee in consultation with Central Electricity Authority -Reg. 02-09-2026
274 CEA’s site visit report for 400 kV D/C Twin Moose Sambha – Amargarh Transmission Line of INDIGRID on 17.11.2021 02-09-2026
275 Draft Manual on Transmission Planning Criteria, 2022- for comments of stakeholders (Last date 30th June,2022) 02-09-2026
276 Draft Manual on Transmission Planning Criteria, 2022- for comments of stakeholders (Last date 30th June,2022) 02-09-2026
277 Draft Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2022- for inviting public/stakeholders comments ( Last date 28th July, 2022) 02-09-2026
278 Draft Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2022- for inviting public/stakeholders comments ( Last date 28th July, 2022) 02-09-2026
279 Draft Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2022- for inviting public/stakeholders comments ( Last date 28th July, 2022) 02-09-2026
280 Seminar/Interaction on Technological Trends in various aspects of Hydro Power Development 02-09-2026
281 Request for Year wise and Project wise details of Funds released to Discoms/States in Distribution Sector in implementing PSDF schemes across the Country-reg. 02-09-2026
282 Manual of Communication Planning in Power System Operation-31.03.2022 02-09-2026
283 First amendment to Technical Specifications for Bird Flight Diverter(BFD) 02-09-2026
284 Clarification regarding Clause 3(j) of Guidelines for the Type Tests for Major Equipment in Power Sector wrt PQ tests 02-09-2026
285 Draft Central Electricity Authority (Furnishing of Statistics, Returns and Information) Regulations, 2007 02-09-2026
286 Request for clarification on the data of rural and urban HHs electrification submitted by BEST (April, 2020-March, 2021) 02-09-2026
287 Request for clarification on the data of rural and urban HHs electrification submitted by BEST (April, 2020-March, 2021) 02-09-2026
288 Clarification of data for rural and urban household electrification–submitted by BEST (April2020-march, 2021) -Reg. 02-09-2026
289 Request to furnish year wise details of CAPEX Data in Distribution Sector (66kV,33kV and below) from end of 12th plan to 2020-21-Reg. 02-09-2026
290 Central Electricity Authority (C.E.A) Annual Report 2021-22 – reg 02-09-2026
291 Compliance of Orders issued by Government of India in respect of Make in India (MII) initiative 02-09-2026
292 Guidelines for the Type Tests for Major Equipment in Power Sector 02-09-2026
293 Guidelines for Model Quality Assurance Plan (MQAP) for major equipment of Power Sector 02-09-2026
294 Constitution of committee on Ease of doing Business-Rsducing Regulatory Burden-regarding 02-09-2026
295 Constitution of committee on Ease of doing Business-Rsducing Regulatory Burden-regarding 02-09-2026
296 Information regarding Online submission of application for Prior approval under section 68(1) of Electricity Act, 2003 02-09-2026
297 Login to newly developed intranet portal and profile updation by CEA / RPCs Officers / staffs – regd. 02-09-2026
298 Baseline Carbon Dioxide Emission Database Version_17 02-09-2026
299 Guidelines for exemption/relaxation from mandatory co-firing of Biomass by Thermal Power Plants 02-09-2026
300 Uploading of data in web based software (POLLING PARTY MASTER ) Personnel Information System 02-09-2026
301 First Indian Technology Catalogue (Generation and Storage of Electricity) 02-09-2026
302 Circulation of Guidelines for Model QAPs for equipment of Substations, Switchyards and Transmission Lines – inviting comments/ suggestion 02-09-2026
303 Guidelines for Type Test Validity and Model QAP for Distribution Sector 02-09-2026
304 Draft Guidelines for Type Tests validity of Electro-Mechanical Equipment and Draft Guidelines for Model Quality Assurance Plan (MQAP) for major Electro-Mechanical Equipment in Thermal Power Sector – for Stakeholder(s) comments 02-09-2026
305 Circulation of Guidelines for Model QAPs for major Electrical & Mechanical (E&M) equipment in Hydro Power Sector – inviting comments/ suggestions -reg. 02-09-2026
306 Submission of Immovable Property Return (IPR) for the year 2021 (as on 31.12.2021) by the Officers of CSS cadre – Regarding. 02-09-2026
307 Circulation of Guidelines for Type Test validity period of major Electrical & Mechanical (E&M) equipment in Hydro Power Sector – inviting comments -reg. 02-09-2026
308 CEA Annual Report 2020-21 02-09-2026
309 Draft Central Electricity Authority (Technical Standards for Construction of Electrical Plants and Electric Lines) Regulations, 2021”for inviting the public comments 02-09-2026
310 Draft Central Electricity Authority (Safety Requirements for Construction, Operation and Maintenance of Electrical Plants and Electric Lines) Amendment Regulations, 2021 -inviting public comments 02-09-2026
311 Draft Indian Standards on mass consumption products/consumer goods and need for issuance of Quality Control Order (QCO) 02-09-2026
312 Final Report of the Task force for Categorization of Thermal Generating Units 02-09-2026
313 Draft Indian Technology Catalogue 02-09-2026
314 Formats proposed for deletion and the draft formats proposed for modification of “Central Electricity Authority (Furnishing of Statistics, Returns and Information) Regulations, 2007” 02-09-2026
315 CEA (Cyber Security in Power Sector) Guidelines, 2021 02-09-2026
316 Upsation of Central Public Information Officers (CPIOs) and Appellate Authorities (AAs) of CEA (HQ) and its Subordinate Offices Reg 02-09-2026
317 Constitution of a Committee in CEA to suo moto scrutinize tenders floated for Public Procurement having value Rs. 500 crores and above. 02-09-2026
318 Amendment No. 1 to “Standard Specifications and technical Parameters for Transformers and Reactors (66 kV & above voltage class) 02-09-2026
319 Amended CEA’s Guidelines for the Validity Period of Type Test(s) conducted on Major Electrical Equipment in Power Transmission System (Issued on 17.09.2021) 03-09-2026
320 Extension of validity date of Type Test Certificate up to 30.09.2022 and amendment to CEA’s “Guidelines for the Validity Period of Type Test(s) conducted on Major Electrical Equipment in Power Transmission System (Issued on 17.09.2021) 03-09-2026
321 Executive Summary-Jun-21 03-09-2026
322 Executive Summary – Jun-21 03-09-2026
323 Unit_wise_FGD_implementation_status_and_summary_sheet_for_August_2021 03-09-2026
324 Standard Technical Specifications for Power Transformers for Solar Park Pooling Stations 03-09-2026
325 Standard specification for power transformer for solar park pooling station 03-09-2026
326 Baseline Carbon Dioxide Emission Database Version 16.0 03-09-2026
327 Revised Standard Operating Procedure to deal with Intensive Examination carried out by Chief Technical Examiners’ Organization 03-09-2026
328 The Concept Paper on Insulated Cross Arm 03-09-2026
329 Submission of data for Annual Report of CEA for 2020-21 03-09-2026
330 Standard Specifications and Technical Parameters for Transformers and Reactors (66 kV & above voltage class) 03-09-2026
331 Invitation of comments on draft Standard Technical Specification for Steel Pole Structure 03-09-2026
332 Approval of the Competent authority is hereby conveyed for constitution of computer screening & Purchase Committee (CSPC) in CEA (HQ) 03-09-2026
333 Launching of India RE Dashboard 03-09-2026
334 Details Regarding vaccination of employees of organization under Mop 03-09-2026
335 Market Monitoring Cell Annual Report 2019-20 03-09-2026
336 List of Deemed Licensees under SERCs/ JERCs in the country 03-09-2026
337 Request for providing data/information for HHs electrification/Domestic Connection by Discoms / Power department 03-09-2026
338 Reminder letter for providing data/information for HHs electrification/Domestic Connection by Discoms / Power department 03-09-2026
339 Technical Specifications for Bird Flight Diverter 03-09-2026
340 Disaster Management Plan for Power Sector- January 2021 03-09-2026
341 Notice for prospective eligible bidders to submit its details to CEA for coal linkage auction by CIL under Para B(viii)(a) covering Para B(iii) for the Quarter April to June, 2021 03-09-2026
342 Guidelines For Renovation & Modernisation Life Extension Works Of Coal lignite Based Thermal Power Stations 2020 03-09-2026
343 Review of environmental norms- Plant location specific emission standards for Thermal Power Plant 03-09-2026
344 Quarterly Review Report Renovation & Modernisation of Thermal Power Stations (Sept.,2020) 03-09-2026
345 Plant wise details of under construction Renewable Energy Projects and Associated Transmission Network 03-09-2026
346 Formats for Annual Generation Program for FY. 2021-2022 03-09-2026
347 Letter for Furnishing Information for Annual Generation Program for FY. 2021-2022 03-09-2026
348 The report on 19th Electric Power Survey of India (Volume III) part-II (Mega Cities) 03-09-2026
349 Constitution of a committee for independent verification of self-declarations and auditor’s / accountant’s certificates on random basis and in the case of complaints 03-09-2026
350 Guidelines for the Validity Period of Type Test (s) conducted on Major Electrical Equipment in Power Transmission System 03-09-2026
351 Establishment of standardization cell in CEA 03-09-2026
352 GUIDELINES FOR AVAILABILITY OF SPARES AND INVENTORIES FOR POWER TRANSMISSION SYSTEM (TRANSMISSION LINES & SUBSTATION/SWITCHYARD) ASSETS 03-09-2026
353 Notice to invite details from eligible bidders for coal linkage auction by CIL under Para B(viii)(a) covering Para B(iii) for the Quarter October-December,2020 03-09-2026
354 Notice for submission of Monthly RE generation data in revised format 03-09-2026
355 REPORT OF STANDING COMMITTEE OF EXPERTS ON FAILURE OF 220 kV & ABOVE VOLTAGE CLASS SUBSTATION EQUIPMENT (APRIL 2018-MARCH 2019) 03-09-2026
356 REPORT ON OPTIMAL GENERATION CAPACITY MIX FOR 2029-30-FINAL 03-09-2026
357 Notice to invite details from eligible bidders for coal linkage auction by CIL under Para B(viii)(a) covering Para B(iii) for the Quarter July-September,2020 03-09-2026
358 Data Visualisation Page is being created for sharing data with stakeholders 03-09-2026
359 Load Generation Balance Report 2016-17 – Revised (Due to an inadvertent error noticed in data entry, LGBR for the year 2016-17 has been revised) 03-09-2026
360 Workshop on “Coordinated Power Demand Forecasting and Procurement Planning : Enabler for 24 x 7 Power Supply” 03-09-2026
361 Distribution of Letter of Appreciation to employees of Ministry, PSUs & Organisations/Satatutory Bodies under Ministry of Coal, Power & NRE 03-09-2026
362 Highlights of 2nd National Workshop on Electrical Safety 03-09-2026
363 Highlights of Brain Storming Session of 19th Electric Power Survey (EPS) held on 29th May 2015 03-09-2026
364 Launching of CEA Clearance Web Portal 03-09-2026
365 Joint CEA-ICA India One-day National Workshop on Electrical Safety at New Delhi 03-09-2026
366 Material on important works/achievements or any new development pertaining to F&CA Divisions of CEA 03-09-2026
367 GROWTH OF ELECTRICITY SECTOR IN INDIA FROM 1947- 2025 03-09-2026
368 Corrigendum w.r.t. Technical parameters of 400/132 kV, 315 MVA, 3-Phase Auto Transformer specified in CEA’s “Standard Specifications and Technical Parameters for Transformers and Reactors (66 kV and above)” 03-09-2026
369 CEA Issues “Comprehensive guidelines for the usage and sharing of fiber cores of Optical Ground Wire (OPGW)/ Under Ground Fiber Optic (UGFO) Cable for power system applications.” 03-09-2026
370 Message on Electrical Safety 10-07-2026
371 Hydro Power in India: CEA’s Perspective- Keynote address by Chairpeson Shri Ghanshyam Prasad 13-07-2026
372 General Implementation timelines for Inter-State Transmission System (ISTS) projects 13-07-2026
373 Monthly Installed Capacity Report as on 30.06.2026 13-07-2026
374 Advisory on safe and judicious use of electricity in view of El Niño conditions or otherwise 12-08-2026
375 Report of Committee for trajectory of Indeginsation of SCADA system 25-08-2026
376 “Notice of Result–Appointment to the post of Multi-Tasking Staff of General Central Service on compassionate grounds” 25-08-2026
377 Draft Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2026- Invitation of Public Comments 25-08-2026
378 Chariperson CEA addresses 25-08-2026