Ultra Mega Power Project Division - Brief Description

Chief Engineer:

Ultra Mega Power Project Division - Other Reports

  • Detailed Status of Awarded Ultra Mega Power Projects (UMPPs)s
  • Norms for Installation of Wet Limestone based FGD in compliance of New Environmental Rule as notified by MoEF&CC on 7th December-2015 (From 21st February, 2019 onwards)
  • Norms for Installation of Ammonia & Sea water based FGD for New Environmental regulation of MoEF&CC dated 7th December-2015 (From 20th March, 2019 onwards)
  • Link for Format 1 and Format 2 for thermal power plants for providing data on installations of FGD System
  • Link for Format 3 for thermal power plants for providing data on installations of FGD System
  • Link for Format 4 for thermal power plants for providing data on installations of FGD System
  • Brief Status of awarded Ultra Mega Power Projects (UMPPs)
  • Link for Format 3 as per Minutes of Meeting on ‘Adherence to Environmental Norms as per Environment (Protection) Amendment Rules 2015 for Thermal Power Stations’ with IPPs-installations of FGD
  • Minutes of Meeting on ‘Adherence to Environmental Norms as per Environment (Protection) Amendment Rules 2015 for Thermal Power Stations’ with IPPs-installations of FGD
  • Minutes of Meeting on Replacement of Old & inefficient units held on 18.8.2015 at CEA

  • सम्पर्क
  • आर.टी.आई.
  • शिकायत
  • अभिलेख
  • प्रकाशन
  • इनोवेशंस
  • साइट मैप
  • बाहरी लिंक्स
  • अस्वीकरण   |   कॉपीराइट नीति   |   हाइपरलिंक नीति   |   प्राइवेसी नीति  |   नियम व शर्तें  |   सहायता

  • ©cea.nic.in - केन्द्रीय विद्युत प्राधिकरण, सेवा भवन, रामाकृष्ण पुरम, सेक्टर-1, नई दिल्ली - 110 066