CEI - Forms
- Form I for Inspection Report_Installations of voltage up to and including 250V
- Form II for Inspection Report_Installations of voltage level more than 250V up to and including 650V
- Form III for Inspection Report_Installations of voltage exceeding 650V
- Format of Work Completion Certificate-To be submitted by the owner along with the application for statutory inspection of the Electrical Installations under Regulations 43/36 of CEA(Measures Relating to Safety and Electric Supply)Regulations,2010
- FORM A - Application for the Statutory Inspection of the Electrical Installations under Regulations 43 & 32 of CEA (Measures relating to Safety and Electric Supply) Regulations, 2010
- FORM B - Application for the Statutory Inspection of the Overhead Transmission Lines under Regulations 43 of CEA (Measures relating to Safety and Electric Supply) Regulations, 2010
- FORM C - Application for Statutory Periodical Inspection of the Electrical Installations under Regulations 30 of CEA (Measures relating to Safety and Electric Supply) Regulations, 2010